Scrubber Design Calculation Excel Hot (2025)
#ScrubberDesign #ExcelHot #AirPollutionControl #WetScrubber #ChemicalEngineering #ExcelForEngineers #EnvironmentalEngineering
| Scrubber Type | Key Design Outputs | |---------------|--------------------| | | Throat velocity (60–120 m/s), pressure drop (based on Johnstone eq.), liquid-to-gas ratio (L/G) | | Spray Tower | Sauter mean diameter (SMD) of droplets, tower height, gas residence time | | Packed Bed | Packing factor (Fp), flooding % (≤75%), pressure drop via Leva or Eckert correlation | | Tray (Impinement) | Number of trays, slot velocity, weir loading | scrubber design calculation excel hot
Qsat=Qin×Volume Correction Factorcap Q sub s a t end-sub equals cap Q sub i n end-sub cross Volume Correction Factor For example, a gas at 450∘F450 raised to the composed with power cap F might have a correction factor of 3. Determine Column Diameter pressure drop (based on Johnstone eq.)