Pwd Dsr 2017-18 Maharashtra Jun 2026
| Item Code | Description | Unit | Rate (₹) | |-----------|-------------|------|-----------| | PW-01.01 | Excavation in ordinary soil (upto 1.5m depth) | m³ | 185 | | PW-04.02 | Plain Cement Concrete (PCC) 1:4:8 (40mm aggregate) | m³ | 3,850 | | PW-07.10 | RCC M20 grade (1:1.5:3) excluding steel | m³ | 5,200 | | PW-09.30 | Reinforcement steel (Fe 500) cutting, bending, placing | MT | 7,850 | | PW-11.05 | Brick masonry (1:6 cement mortar) in superstructure | m³ | 5,100 | | PW-14.20 | Plastering 12mm thick (1:4) on brick wall | m² | 145 | | PW-18.05 | Vitrified tile flooring (600x600mm) | m² | 790 | | PW-22.30 | Painting – two coats of acrylic emulsion (interior) | m² | 48 | | RW-02.12 | Granular sub-base (GSB) Grade II | m³ | 1,020 | | RW-05.07 | Bituminous Macadam (BM) – 75mm thick | m² | 615 | | RW-07.09 | Dense Bituminous Macadam (DBM) – 50mm thick | m² | 570 | | RW-09.12 | Bituminous Concrete (BC) – 30mm thick | m² | 440 |
The utilization rate across most districts exceeded 87%, though and Nandurbar recorded delays due to the monsoon and law-and-order issues. pwd dsr 2017-18 maharashtra
"Because they are factoring in 'batta' (idle charges) for the monsoon delays typical in Kolhapur," Patil replied. | Item Code | Description | Unit |